Driver's Handbook ⏱ Calculator

Cabotage – 3 operations in 7 days and a 4-day cooling-off period

After an international carriage, you may carry out a maximum of 3 domestic operations within 7 days. After that, the vehicle must wait 4 days.

Applies in: EU Last updated:

This translation was made automatically and has not been reviewed yet. If in doubt, the Dutch text and the official legal text prevail.

Cabotage is domestic carriage of goods in a country where your employer is not established, for example with a Belgian truck from Lyon to Marseille.

The basic rule

Rule Content
Condition You enter the country with a laden international carriage
Number After unloading that carriage, a maximum of 3 cabotage operations
Time limit The last cabotage operation must be unloaded within 7 days after unloading the international carriage
Entering unladen If you enter a country unladen after an international carriage elsewhere, you may carry out a maximum of 1 cabotage operation there, within 3 days of entering (and within the 7 days)

The cooling-off period (since 21 February 2022)

After your last cabotage operation, the same vehicle may not carry out any cabotage in that country for 4 days. These 4 days begin at 00:00 on the day after the last unloading.

Example: you unload your last cabotage operation in France on Tuesday at 16:00. The cooling-off period runs from Wednesday 00:00 until Saturday 24:00. From Sunday, the vehicle may carry out cabotage in France again, after a new international carriage.

International carriages to and from that country are still permitted during the cooling-off period.

Documents in the cab

You must be able to show clear evidence of:

  1. the international carriage with which you entered the country;
  2. each cabotage operation you carried out afterwards.

For each operation, the document (usually the CMR or e-CMR) must show: the details and signature of the consignor, the carrier and the consignee, the place and date of loading and unloading, a description of the goods and the registration plate of the vehicle.

Cabotage = posting

During cabotage, you are posted in that country. You are then entitled to at least the pay of that country and your employer must submit a posting declaration. See the chapter Pay, posting and social rights.

Vans

Since 21 May 2022, a company carrying out international carriage or cabotage with vehicles above 2.5 tonnes needs a Community licence. The cabotage rules then also apply to those vehicles.

Sources